Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
A question for interpolation period!
#1
Hi,
For PPMAC, I wonder if the "data" in the instruction PVT{data} can be set to a floating point with double-precision format, such as follows:
--------------------
PVT 3.045678122
A...B...C...
PVT 4.458963145
A...B...C...
--------------------
I want to use cubic splines to do the joint interpolation by PPMAC.
It seems that Turbo PMAC do not support that. Is it Right?

Thank you!
Reply
#2
Yes, move times in Power PMAC for PVT and SPLINE mode moves are double-precision floating-point values.

In Turbo PMAC, if I42 is 0, the time has a resolution of 1/4096 of a millisecond, but also a maximum time of 4096 milliseconds.
Reply


Forum Jump:


Users browsing this thread: 1 Guest(s)